Overview
This development consists of three separate six-storey buildings with a total of 319 units, all sharing a common parkade. The homes include 1-bedroom, 2-bedroom, 2-bedroom + den, 2-bedroom + open den, 2-bedroom + den + media, and 3-bedroom condos. Each suite comes with a large, concrete-walled storage garage of more than 180 cubic feet. To minimize noise transmission, the buildings are constructed with hybrid concrete and wood floors that feature sound-dampening insulation, along with dual-layer drywall assemblies.
CHALLENGE
Tight site access created logistical challenges throughout the build. Space for deliveries, material staging, and parking was limited, so the site couldn’t absorb much activity at any one time. As a result, every delivery, crane lift, and trade movement had to be planned around the available space, and materials often had to arrive just in time rather than being stored on site.
SOLUTION
Keeping the project on schedule under these conditions took careful sequencing, close coordination with trades and suppliers, and efficient day-to-day site management. Deliveries were scheduled to avoid overlap, work areas were rotated as phases progressed, and crews adjusted their workflows to the constrained footprint. This planning kept the site safe and organized, reduced disruption to neighbours and the surrounding area, and allowed work to keep progressing steadily despite the limited space.